TitleProduct

OEM Customized Aluminum Alloy Intake Manifold Automotive Manifold Part

  • Price:

    Negotiable

  • minimum:

  • Total supply:

  • Delivery term:

    The date of payment from buyers deliver within days

  • seat:

    Guangdong

  • Validity to:

    Long-term effective

  • Last update:

    2017-12-24 21:37

  • Browse the number:

    273

Send an inquiries
+
HK AA Industrial Co., Limited
Contactaixin:

Mr. Iven Wang(Mr.)  

Email:

telephone:

phone:

Arrea:

Guangdong

Address:

No 4 Building, Jinlong Industrial Zone, Longjiang Road, Xie Keng, Qingxi Town, Dongguan, Guangdong, China

Website:

http://hkaa2011.pcjjs.com/

+

OEM customized aluminum alloy intake manifold automotive manifold part

Manufacturing process :lathe machining

Testing equipment:projector


We are willing to provide you with sample for testing, we have 16-year manufacturing and solutions experiences.


We are ISO 9001: 2008 certified firm.



Our Services
 

Industry Focus

Appliance/ Automotive/ Agricultural
Electronics/ Industrial/ Marine
Mining/ Hydraulics/ Valves
Oil and Gas/ Electrical/ Construction

Intended Application

Shafts; Valve Components;
Automatic Door Components
Cable/ Electronic Connector
Fire Suppression System Components
Fittings/ Fasteners; Gears/ Hardware;
Roller Bearings

Lead Times Available

Max: 2 Weeks (On Initial Order)
Rush Services Available

Industry Standards

ISO 9001:2008; PPAP
RoHS Compliant

Additional Capabilities

CAD Design Services; CAM Programming Services
Coordinate Measuring Machines (CMM)
Reverse Engineering

Equipment List

From simple 2-axis turning to 7-axis,
turn-mill-drill CNC Swiss-type machines,
molding machines/ stamping machines
automatic lathe machines/ spring machines.

Material
(Metals or plastic)

Alloy Steels/ Aluminum/ Brass/ Bronze Alloys
Carbon Steel/ Copper/ Stainless Steel/ Tool Steel
Cold Rolled Steel/ Bearing Steel
ABS/ Delrin/ Nylon/ PVC

Testing equipment

Projector. Calliper, micrometer, plug gauge, ring gauge, thread gauge

Processes
(Special Capabilities)

Broaching/ Hobbing/ Slotting/tapping

Tolerance

±0.0002 in; ±0.0051 mm

packing

For light objects:
bubble pack individually to prevent from damaging
and scratches in transporting, then in carton;
for heavy objects:
wrapped in PE bags and then in wooden boxes



Shipping


1. We are willing to provide with sample for quality and function testing.
2. Delivery time:within 20 working days .



FAQ

Q1:How to guarantee the Quality of Industrial Parts?
A1:we are ISO 9001-2008 certified firm. we have the integrated system for industrial parts quality control. We have IQC (incoming quality control), IPQCS (in process quality control section), FQC (final quality control) and OQC (out-going quality control) to control each process of industrial parts prodution.

Q2:What's the Advantage of Your Parts for Industry Products?
A2:Our advantage is the competitive prices, fast delivery and high quality. Our employees are responsible-oriented, friendly-oriented,and dilient-oriented. our Industrial parts products are featured by strict tolerance, smooth finish and long-life performance.

Q3:what are our machining equipmengts?
A3:Our machining equipments include CNC milling machines, CNC turning machines, stamping
machines,hobbing machines, automatic lathe machines, tapping machines, grinding machines,
screw machines, cutting machines and so on.

Q4: What shipping ways our use?
A4:Generally speaking, we will use UPS or DHL to ship the products. Our customers can reach the
products within 3 days.
If our customers do not need them urgently, we will also use Fedex and TNT.
If the products are of heavy weight and large volumn, we will ship them by sea. This way can save
our customers a lot of money.

Q5:Who are our main customers?

A5:HP, Samsung, Jabil Group,Lexmark,Flextronic Group.

Q6:What materials can you handle?
A6:Brass,bronze,copper,stainless steel, steel,aluminum,titanium And plastic.

Q7:How Long is the Delivery for Your Industrial Part?
A7:Generally speaking, it will take us 15 working days for machining parts and 25 working days for
the for stamping parts products. But we will shorten our lead time according to customers' demands if we are able to.